Status of Environmental Assessments for Transportation, Infrastructure and Utility Projects on the Oak Ridges Moraine since 2001

           
mtm logo

Page 1 | 2 | 3 | 4 | 5 | 6
Back to STORM main site

Moraine map
Point Number
Proponent Project StudyArea Project Type EA Type Status More Information (longer URLs are abbreviated)
1
Township of Adjala-Tosorontio Sub Project 2 - Bridge #15 Replacement Lot 6, Concession Road 3 Road Started in January 2007 http://www.ceaa.gc.ca/...25002&SrchPg=2
2
County of Simcoe Bailey Creek Bridge 10th Sideroad and Concession 5, Adjala-Tosorontio (Southwest of Loretto) Road Municipal Class EA - Schedule B Completed in January 2007 Notice of completion:
http://www.county.simcoe.on.ca/...2006.pdf
3
County of Simcoe Hwy 50 Improvements Country Rd 50 from Highway 9 to Highway 89, Adjala-Tosorontio Road Municipal Class EA - Schedule C Completed in April 2007 Notice of completion:
http://www.county.simcoe.on.ca/...2007.pdf
10
Region of Peel Gore Road - (King  Street to Patterson Sideroad) Upgrade Gore Road - King  Street to Patterson Sideroad Road Municipal Class EA - Schedule B Completed in December 2006

http://www.peelregion.ca/...notice-060201.htm,
http://www.peelregion.ca/...notice-061103.htm

 

14
York Region Keele Street & 15th Sideroad Intersection Improvement Keele Street & 15th Sideroad Road Municipal Class EA - Schedule B Public consultation ended July 2007 http://www.york.ca/...Jun26+07.pdf
17
York Region North Yonge Street Corridor Public Transit and Associated Road Improvements Yonge Street (between 19th Avenue and Green Lane) Road Individual EA Final public consultation Sept 2007 http://www.york.ca/...Yonge+St+EA+Final.pdf,
http://www.york.ca/...Submission.pdf,
http://www.york.ca/...Yonge+Street+ToR.pdf,
http://www.york.ca/...Corridor+EA.htm
20
York Region Bloomington Road (Bathurst to Yonge Streets) Upgrade Bloomington Road (Bathurst Street to Yonge Street) Road EA completed under another project in March 2004
21
York Region Bloomington Road (Bayview Avenue to Highway 404) Upgrade Bloomington Road (Bayview Avenue to Highway 404) Road EA In Progress
22
York Region Bloomington Road (Yonge Street to Bayview Avenue) Upgrade Bloomington Road (Yonge Street to Bayview Avenue) Road EA Completed under another project in March 2004
23
York Region Leslie Street (Bethesda Sideroad to Bloomington Road) Upgrade Leslie Street (Bethesda Sideroad to Bloomington Road) Road Environmental Study Report filed in September 2006
24
Town of Richmond Hill East Lake Wilcox Road  Needs Study, Master Plan Study Area bounded by North Lake Road, Bayview Avenue, Yonge Street and Old Colony Road Road Municipal Class EA - Schedule B Completed in May 2005 (with 2 schedule B projects recommended from this) http://www.town.richmond-hill.on.ca/...lake_wilcox
http://www.richmondhill.ca/...completion.pdf
27a
York Region Bayview Avenue (19th Avenue to  Stouffville Road) Upgrade Bayview Avenue (19th Avenue to Stouffville Road) Road EA In Progress
27b
York Region Bayview Avenue (Elgin Mills Road to  Stouffville Road) Upgrade Bayview Avenue (Elgin Mills Road to Stouffville Road) Road Completed in March 2004
29
York Region South Yonge Street Corridor Public Transit Improvements Yonge Street  (between Steeles and 19th Avenues) Road Individual EA Completed in April 2006 http://www.ene.gov.on.ca/...yongest_corridor.htm,
http://www.york.ca/NR/...Yonge+St+EA.pdf,
http://www.york.ca/NR...Final+July+2007.pdf
30
York Region Teston Road (Dufferin Street to Bathurst Street) Upgrade Teston Road (Dufferin Street to Bathurst Street) Road Completed in February 2003
31
York Region Bathurst Street (Teston Road to Highway 7) Upgrade Bathurst Street (Teston Road to Highway 7) Road To be completed in January 2008 http://www.york.ca/...June19.07.pdf
32
City of Vaughn  Forest Run Boulevard, Ten Oaks Boulevard and Dufferin Hill Drive Upgrade

see map http://www.city.vaughan.on.ca/...
(pdf)
(just at Rutherford Road and Dufferin Street Intersection)

Road Started in May 2007 http://www.city.vaughan.on.ca/...202007.pdf
33
York Region Stouffville Road (Woodbine Avenue to Highway 48) Upgrade Stouffville Road (Woodbine Avenue to Highway 48) Road Environmental Study Report filed in March 2006
35
York Region Vivian Road (Highway 48 to York-Durham Line) Upgrade Vivian Road (Highway 48 to York Durham Line) Road Environmental Study Report filed in mid-May 2005
37
York Region Ninth Line (North of Major Mackenzie to north of Main Street) Upgrade Ninth Line (North of Major Mackenzie to North of Main Street) Road Environmental Study Report, the review of which could trigger a Municipal Class EA Notice of Environmental Study Report review in June 2007 http://www.york.ca/...08JAN07+_2_.pdf
38
CN/GO/Canadian Transport Agency Construction of Two Road/Railway Level Crossings Hoover Park Drive and Park Drive, Whitchurch-Stouffville Road Completed in May 2007 http://www.ceaa.gc.ca/...7023&SrchPg=2
41
Town of Whitchurch-Stouffville Main Street & 10th Line Intersection Improvements Main Street and 10th Line, Whitchurch Stouffville Road Municipal Class EA Seems to have finished around December 2003 http://www.townofws.com/..."environmental assessment"
42
City of Pickering/Industry Canada Rehabilitation of the Reesor Creek Bridge Uxbridge/Pickering Townline Road crossing Reesor Creek Road Completed in March 2007 http://www.ceaa.gc.ca/...12058&SrchPg=2
43
Durham Region Toronto Street (Regional Highway 47) Upgrade Sixth Concession to Campbell Drive, Uxbridge Road Municipal Class EA - Schedule B Construction to be completed in Fall of 2007 http://www.region.durham.on.ca/.../torontostrt.htm
44
Durham Region Myrtle Road/Raglan Road (Regional Road 5) Reconstruction Highway 7/12 to West of Simcoe Street (Regional Road 2) Road Construction completed in 2006
45
Ministry of Transportation 407 East Extension On the Moraine following Hwy 115 Road Individual EA Report in progress, public meetings still being held http://www.407eastea.com/
47
Clarington Concession Road VIII Clarke Bridge Repair Southeast of Concession 8 and Cooney Road
48
Ministry of Transportation/Industry Canada Reconstruction of Bridge No. 98097 (05-01-12779) Lot 21, Concession 7&8, Clarington Road Completed in April 2007 http://www.ceaa.gc.ca/...Y&SrchPg=2
49
Ministry of Transportation Scugog River Bridge Rehabilitation Project Lots 15 & 16, Concession 5, City of Kawartha Lakes (former Township of Ops, County of Victoria), where Highway #7 crosses the Scugog River Road Municipal Class EA - Schedule B Started in January 2007 http://www.ceaa.gc.ca/...25555&SrchPg=2
50
Ministry of Transportation Highway 115 Eastbound Reconstruction (WP 4353-04-01) Highway 115 (Highway 35 to Porter Road) Road Municipal Class EA - Schedule C
51
Ministry of Transportation Shoulder Improvements to Highway 115 (WP 4353-04-04) Highway 115 (Highway 7 (N-S) to Boundary Road) Road Municipal Class EA - Schedule C
52
Ministry of Transportation Highway 115 Eastbound Restoration (WP 4353-04-02; 4353-04-03) Highway 115 (Highway 7A (N-S) to Quarter Line) Road Municipal Class EA - Schedule C
4
Townshop of Adjala-Tosorontio Colgan Water Supply (ground source) Lot 6, Con. 8.3, 1 km North of Highway 9 Water Supply Municipal Class EA - Schedule B Completed in September 2005 More information about the Colgan Water System can be found at
http://www.county.simcoe.on.ca/...5021
6
Region of Peel North Peel Water Treatment Facility Upgrades (ground source) Around Mount Hope Road and Hunsden Water Supply Municipal Class EA - Schedule B Completed in May 2005 http://www.peelregion.ca/...050509.htm
7
Region of Peel Construction of Watermain across    Humber River at Highway 50 Hwy 50 at Humber (North of Pine) Water Supply Municipal Class EA - Schedule B Completed in April 2007 http://www.peelregion.ca/...061130.htm,
http://www.peelregion.ca/...070302.htm
8
Region of Peel Caledon East Water Supply (ground source) See map: http://www.region.peel.on.ca/... Water Supply Municipal Class EA - Schedule B Completed in October 2007 http://www.region.peel.on.ca/...060925.htm,
http://www.region.peel.on.ca/...caledon-east-ea.htm
9
Region of Peel North Peel Water Treatment Facility Upgrades (ground source) Around Airport Road and Old Church Road Water Supply Municipal Class EA - Schedule B Completed in May 2005 http://www.peelregion.ca/...-050509.htm
12
York Region King City Feedermain (lake source) About 1km NE of Keele Street and King Road (past end of Manitou Drive) Water Supply Municipal Class EA - Schedule B Completed in March 2004
13
York Region King City Watermain and Elevated Tanks (lake source) Most of King City Water Supply Seems to have started as Municipal Class Assessment - Schedule B, then became Schedule C Completed in October 2007 Full study available at
http://www.york.ca/...WWw.htm
,
http://www.york.ca/...aug+07.pdf
15
York Region Bathurst Street Watermain (Clearmeadow to Woodsprings) Bathurst Street Watermain (Clearmeadow to Woodsprings) Water Supply Construction to commence in Sept 2007
16
York Region Bathurst Street Watermain (Orchard Heights) Orchard Heights pumping station to West Newmarket Reservoir Water Supply Public consultation held in 2004
19
York Region Aurora Newmarket Feeder and Watermains Pump station at Keele Street and Teston Road (Vaughan); Watermains along Keele Street, King Side Road, and Baturst Street (from King Side Road to Wellington); and an inground reservoir in the vicinity of Bloomington Road and Bathurst Street Water Supply Currently under construction
25
York Region Pressue District Nine Water Storage Needs See map in the link Water Supply Municipal Class EA - Schedule B Started in September 2007 http://www.york.ca/...District+9.pdf
26
York Region North Richmond Hill Elevated Tank Study area from Bathurst Street to Bayview Avenue, and Gamble Road to Bloomington Road Water Supply Municipal Class EA - Schedule B Completed in January 2007 http://www.york.ca/...20060503.pdf,
http://www.york.ca/...EA+-+76100.pdf
34
York Region Stouffville Watermain and Pumping Station Stouffville Road (Ringwood Drive to McCowan Road) Water Supply Municipal Class EA - Schedule B Completed in 2006 http://www.york.ca/...Bulletin%231.pdf,
http://www.york.ca/...Mount+Albert.pdf
36
York Region Ballantree-Mussleman Lake and Bloomington Water Supply (ground source) Area bordered by Vivian Road to Bloomington Road, and Warden Avenue to the York -Durham Line Water Supply Municipal Class EA - Shedule B Started in August 2006 http://www.york.ca/...020806.pdf
40
York Region Stouffville Elevated Tank Wastewater Projects Tenth Line (Main Street to Bethesda Sideroad) Water Supply Construction Complete
5
Town of New Tecumseth Wastewater Treatment Study (existing conditions and future needs) Study area includes small part of Oak Ridges Moraine, above Highway 9 in New Tecumseth, see map on page 57 of study (see link) Wastewater Study report from December 2005 http://calendar.county.simcoe.on.ca/...ESR_Report.pdf
11
York Region King City Trunk Sewer Line King Road and Keele Street, with pipe routing east down King Road,
see map: http://king.ca/...pdf
Wastewater Municipal Class EA - Schedule B Currently under construction http://www.york.ca/services/sewers/king+city.htm,
http://www.york.ca/...2007.pdf
28
York Region York Durham Interceptor Sewage System  (19th Avenue and Leslie Street) 19th Avenue (Yonge Street to Leslie Street), South on Leslie Street to Elgin Mills Road Wastewater Completed in October 2005 http://ydss.cenet.ca,
http://ydss.cenet.ca...0cd5457
39
York Region Stouffville Water Pollution Control Plant Decommissioning Main Street and Park Drive South
Click here to view google map
Wastewater Decommissioning underway
18
Town of Aurora Stormwater Management Facilities Retrofitting and Creek Erosion Analysis Bathurst Street and McClellan Way (1 block south of Henderson Drive) Stormwater Started in December 2006
46
Hydro One Enfield Transformer Station (Oshawa/Clarington Area) North of Concession Road 7 (between Langmaid Road and Grandview Street North in Clarington) Electricity EA underway http://www.hydroonenetworks.com...TS/default.asp